Maintenance

11 open tasks

Dock C Structural Repairs

open
urgent
dock repair

Address wood rot and structural damage requiring replacement

Due: Mar 15, 2026Est: $15000

Replace Electrical Panels - Dock A

open
high
electrical

Update aging electrical infrastructure

Due: Apr 30, 2026Est: $8500

Boat Ramp Pressure Wash

in progress
medium
cleaning

Pressure wash the boat launch ramp and remove algae buildup before spring season.

Assigned: Dave KlineDue: Mar 10, 2026Est: $150

Fire Extinguisher Inspection — All Docks

open
high
safety

Annual inspection and tagging of all dock fire extinguishers. Replace any expired units.

Assigned: Mike TorresDue: Feb 28, 2026Est: $200

GFCI Outlet Repair — Slip B-03

in progress
high
electrical

Outlet repeatedly tripping during dock walk. Replace GFCI outlet and inspect wiring.

Assigned: Mike TorresDue: Feb 28, 2026Est: $120

Dock B Power Pedestal Cleaning

open
low
electrical

Annual cleaning and corrosion treatment of all Dock B power pedestals.

Assigned: Dave KlineDue: Mar 20, 20260

Fuel Dock Pump Filter Replacement

completed
medium
general

Replace inline fuel filters on both diesel and gas pumps. Routine annual maintenance.

Assigned: Mike TorresDue: Feb 1, 2026Est: $85Actual: $85

Landscaping — Spring Cleanup

deferred
low
landscaping

Trim hedges, remove dead palms, and mulch all planter beds.

Due: Mar 30, 2026Est: $1200

Fuel Dock Hose Inspection

in progress
high
safety

Annual inspection of all fuel dock hoses for cracks, leaks, and compliance.

Assigned: Mike TorresDue: Feb 28, 20260

Parking Lot Pothole Repair

open
low
general

Three large potholes in the main parking lot near the boat ramp.

Due: Mar 15, 2026Est: $800

Gate Keypad Battery Replacement

completed
urgent
electrical

Main gate keypad is showing low battery warning.

Assigned: Dave KlineActual: $12

Dock B Finger Pier Power Outlet

open
high
electrical

Outlet at slip B-03 tripping the breaker. Needs GFCI replacement.

Assigned: Mike TorresDue: Feb 27, 2026Est: $85

Replace Dock A Flood Lights

open
medium
electrical

Three flood lights on Dock A are out. Replace with LED fixtures.

Assigned: Dave KlineDue: Mar 1, 2026Est: $320